WATER INDUSTRY

Water is the most valuable resource on the planet and as such we must take good care of it. This is why environmental protection has been one of the key fields of our development. We have implemented a vast number of electrical & automation systems for tappable and wastewater. From the upgrade of existing plants to the development of new ones.

Our solutions are equally present in municipal and industrial applications. ​

We offer reliable electrical and automation services for our partners. Whether you are an End-User or a Main Contractor. Our offer includes a single-source solution. With our expertise we cover each step of water treatment:​

OUR SOLUTIONS
CASE STUDY
WWTP Kruševac, 2020

PROJECT:

A new wastewater treatment plant and sewerage network in Kruševac was investment of 14.3 million euros funded by Germany’s KfW Development Bank. Ellaktor Group, the largest infrastructure group in Greece was awarded with the project.

The project of construction of the Wastewater Treatment Plant (WWTP) in Kruševac included: 

The new WWTP in Kruševac has capacity to serve an equivalent population of 90,000 inhabitants, with a maximum daily flow of 45,500 m3.

OUR CONTRACT:

WTP Trnovče, 2016

PROJECT:

Construction of the Water treatment plant (WTP) Trnovce represents a stage of a larger project named Morava Regional Water Supply funded by the EU.

UNIHA Wasser Technologie GmbH, an Austrian company that was awarded with the project, sought a trustworthy partner for electrical engineering and automation. Our involvement in the project encompassed the following scope:

The plant processes raw water from the system of wells in Trnovce. Total capacity of the plant after extension is 200l/s. It can serve fresh water for approximately 110,000 inhabitants. 

OUR CONTRACT:

Budva Waterworks and Sewage, 2016
Previous slide
Next slide

PROJECT:

The Public Communal Company Waterworks and Sewerage Budva was dealing with the difficulties with inefficiency and inability to have precise monitoring and control in the water supply. The problem occurred due to highly distributed network of water pumping stations. 

We offered solution for integrated monitoring of the water supply facilities performed through cloud-based web application.

The web application allows real-time monitoring and an advanced alarm system allowing faster and simpler detection of a potential point of failure in the water supply network. The application – WAC (Web Access and Control) has simplified implementation and low maintenance costs. It provides great possibilities for analyses and planning in the Water Supply System.

Integration of the distributed facilities was performed through the cloud-based web application. The web application allows real-time monitoring and an advanced alarm system.

OUR CONTRACT:

WTP Šalinac, 2013

PROJECT:

In 2016 Uniha Wasser Technologie GmbH with Porr d.o.o. was awarded with a project of building the Water Treatment Plant for the City of Smederevo – WTP Šalinac. This project was financed by the funds of KfW bank.

Construction project of the WTP Šalinac is a part of an upgrade project of the water supply system for over 25,000 citizens of the city of Smederevo and nearby villages. 

We’ve engaged in this project with delivering a complete electrical and automation equipment on a turnkey basis. The new WTP Šalinac has the total capacity of 200 l/s. 

OUR CONTRACT:

PROJECT: WWTP Kruševac, Serbia 2020

A new wastewater treatment plant and sewerage network in Kruševac was investment of 14.3 million euros funded by Germany’s KfW Development Bank. Ellaktor Group, the largest infrastructure group in Greece was awarded with the project.

The project of construction of the Wastewater Treatment Plant (WWTP) in Kruševac included: 

The new WWTP in Kruševac has capacity to serve an equivalent population of 90,000 inhabitants, with a maximum daily flow of 45,500 m3 (526 1/s).

OUR CONTRACT:

PROJECT: WTP Trnovče, Serbia 2016

Construction of the Water treatment plant (WTP) Trnovce represents a stage of a larger project named Morava Regional Water Supply funded by the EU.

UNIHA Wasser Technologie GmbH, an Austrian company that was awarded with the project, sought a trustworthy partner for electrical engineering and automation. Our involvement in the project encompassed the following scope:

The plant processes raw water from the system of wells in Trnovce. Total capacity of the plant after extension is 200l/s. It can serve fresh water for approximately 110,000 inhabitants.

OUR CONTRACT:

PROJECT: Budva Waterworks and Sewage, Montenegro 2016

The Public Communal Company Waterworks and Sewerage Budva was dealing with the difficulties with inefficiency and inability to have precise monitoring and control in the water supply. The problem occurred due to highly distributed network of water pumping stations. 

We offered solution for integrated monitoring of the water supply facilities performed through cloud-based web application.

The web application allows real-time monitoring and an advanced alarm system allowing faster and simpler detection of a potential point of failure in the water supply network. The application – WAC (Web Access and Monitoring) has simplified implementation and low maintenance costs. It provides great possibilities for analyses and planning in the Water Supply System.

Integration of the distributed facilities was performed through the cloud-based web application. The web application allows real-time monitoring and an advanced alarm system.

OUR CONTRACT:

PROJECT: WTP Šalinac, Serbia 2013

In 2016 Uniha Wasser Technologie GmbH with Porr d.o.o. was awarded with a project of building the Water Treatment Plant for the City of Smederevo – WTP Šalinac. This project was financed by the funds of KfW bank.

Construction project of the WTP Šalinac is a part of an upgrade project of the water supply system for over 25,000 citizens of the city of Smederevo and nearby villages. 

We’ve engaged in this project with delivering a complete electrical and automation equipment on a turnkey basis. The new WTP Šalinac has the total capacity of 200 l/s. 

OUR CONTRACT:

Lets talk about Solutions.

NEWS

Schedule Appointment

Fill out the form below, and we will be in touch shortly.
Contact Information