WATER INDUSTRY
Water is the most valuable resource on the planet and as such we must take good care of it. This is why environmental protection has been one of the key fields of our development. We have implemented a vast number of electrical & automation systems for tappable and wastewater. From the upgrade of existing plants to the development of new ones.
Our solutions are equally present in municipal and industrial applications.
We offer reliable electrical and automation services for our partners. Whether you are an End-User or a Main Contractor. Our offer includes a single-source solution. With our expertise we cover each step of water treatment:
- Water Treatment Plants
- Wastewater Treatment Plants
- Sludge Treatment Plants
- Water supply network
- Wells & Pumping stations
- Sewage network
PROJECT:
A new wastewater treatment plant and sewerage network in Kruševac was investment of 14.3 million euros funded by Germany’s KfW Development Bank. Ellaktor Group, the largest infrastructure group in Greece was awarded with the project.
The project of construction of the Wastewater Treatment Plant (WWTP) in Kruševac included:
- Mechanical pre-treatment of wastewater
- Primary wastewater treatment
- Biological-chemical wastewater treatment (secondary and tertiary)
- Sludge treatment and exploitation of the produced biogas
The new WWTP in Kruševac has capacity to serve an equivalent population of 90,000 inhabitants, with a maximum daily flow of 45,500 m3.
OUR CONTRACT:
- Engineering
- Electrical Design
- Transformer station
- Medium & Low Voltage
- Motor Control Center
- Control System
- PLC & SCADA Software Development
- Instrumentation
- Diesel Generator
- Cable & Cable Trays
- General Installations
- Instrumentation
- Mounting & Installation
- Commissioning & Start-up
PROJECT:
Construction of the Water treatment plant (WTP) Trnovce represents a stage of a larger project named Morava Regional Water Supply funded by the EU.
UNIHA Wasser Technologie GmbH, an Austrian company that was awarded with the project, sought a trustworthy partner for electrical engineering and automation. Our involvement in the project encompassed the following scope:
- Distributed pumping station
- Filtration chamber
- Sludge treatment hall
- Water treatment plant
The plant processes raw water from the system of wells in Trnovce. Total capacity of the plant after extension is 200l/s. It can serve fresh water for approximately 110,000 inhabitants.
OUR CONTRACT:
- Transformer station
- Diesel aggregate
- Motor control center with PLCs
- 2 SCADA systems
- Instrumentation
- Entire HVAC system
- Mounting & Commissioning
PROJECT:
The Public Communal Company Waterworks and Sewerage Budva was dealing with the difficulties with inefficiency and inability to have precise monitoring and control in the water supply. The problem occurred due to highly distributed network of water pumping stations.
We offered solution for integrated monitoring of the water supply facilities performed through cloud-based web application.
The web application allows real-time monitoring and an advanced alarm system allowing faster and simpler detection of a potential point of failure in the water supply network. The application – WAC (Web Access and Control) has simplified implementation and low maintenance costs. It provides great possibilities for analyses and planning in the Water Supply System.
Integration of the distributed facilities was performed through the cloud-based web application. The web application allows real-time monitoring and an advanced alarm system.
OUR CONTRACT:
- Control System
- Web Access and Control - WAC
- Commissioning & Start-up
PROJECT:
In 2016 Uniha Wasser Technologie GmbH with Porr d.o.o. was awarded with a project of building the Water Treatment Plant for the City of Smederevo – WTP Šalinac. This project was financed by the funds of KfW bank.
Construction project of the WTP Šalinac is a part of an upgrade project of the water supply system for over 25,000 citizens of the city of Smederevo and nearby villages.
We’ve engaged in this project with delivering a complete electrical and automation equipment on a turnkey basis. The new WTP Šalinac has the total capacity of 200 l/s.
OUR CONTRACT:
- Engineering
- Electrical Design
- Transformer Station
- Low Voltage
- Motor Control Center Equipment
- Control System
- PLC & SCADA Software Development
- Instrumentation
- Diesel Generator
- Cable & Cable trays
- General Installations
- Mounting & Installation
- Commissioning & Start-up
A new wastewater treatment plant and sewerage network in Kruševac was investment of 14.3 million euros funded by Germany’s KfW Development Bank. Ellaktor Group, the largest infrastructure group in Greece was awarded with the project.
The project of construction of the Wastewater Treatment Plant (WWTP) in Kruševac included:
- Mechanical pre-treatment of wastewater
- Primary wastewater treatment
- Biological-chemical wastewater treatment (secondary and tertiary)
- Sludge treatment and exploitation of the produced biogas
OUR CONTRACT:
- Engineering
- Electrical Design
- Transformer station
- Medium & Low Voltage
- Motor Control Center
- Control System
- PLC & SCADA Software Development
- Instrumentation
- Diesel Generator
- Cable & Cable Trays
- Mounting & Installation
- Commissioning & Start-up
Construction of the Water treatment plant (WTP) Trnovce represents a stage of a larger project named Morava Regional Water Supply funded by the EU.
UNIHA Wasser Technologie GmbH, an Austrian company that was awarded with the project, sought a trustworthy partner for electrical engineering and automation. Our involvement in the project encompassed the following scope:
- Distributed pumping station
- Filtration chamber
- Sludge treatment hall
- Water treatment plant
The plant processes raw water from the system of wells in Trnovce. Total capacity of the plant after extension is 200l/s. It can serve fresh water for approximately 110,000 inhabitants.
OUR CONTRACT:
- Transformer station
- Diesel aggregate
- Motor control center with PLCs
- 2 SCADA systems
- Instrumentation
- Entire HVAC system
- Mounting & Commissioning
The Public Communal Company Waterworks and Sewerage Budva was dealing with the difficulties with inefficiency and inability to have precise monitoring and control in the water supply. The problem occurred due to highly distributed network of water pumping stations.
We offered solution for integrated monitoring of the water supply facilities performed through cloud-based web application.
The web application allows real-time monitoring and an advanced alarm system allowing faster and simpler detection of a potential point of failure in the water supply network. The application – WAC (Web Access and Monitoring) has simplified implementation and low maintenance costs. It provides great possibilities for analyses and planning in the Water Supply System.
Integration of the distributed facilities was performed through the cloud-based web application. The web application allows real-time monitoring and an advanced alarm system.
OUR CONTRACT:
- Control System
- Web Access and Control - Wac
- Commissioning & Start-up
In 2016 Uniha Wasser Technologie GmbH with Porr d.o.o. was awarded with a project of building the Water Treatment Plant for the City of Smederevo – WTP Šalinac. This project was financed by the funds of KfW bank.
Construction project of the WTP Šalinac is a part of an upgrade project of the water supply system for over 25,000 citizens of the city of Smederevo and nearby villages.
We’ve engaged in this project with delivering a complete electrical and automation equipment on a turnkey basis. The new WTP Šalinac has the total capacity of 200 l/s.
OUR CONTRACT:
- Engineering
- Electrical Design
- Transformer Station
- Low Voltage
- Motor Control Center Equipment
- Control System
- PLC & SCADA Software Development
- Instrumentation
- Diesel Generator
- Cable & Cable trays
- General Installations
- Mounting & Installation
- Commissioning & Start-up